Veterans Affairs Mental Health Clinic and Domiciliary Retro-Commissioning

Farnsworth Group provided retro-commissioning services for the Mental Health Domiciliary at the West Palm VA Health Care System. The project’s main objectives were to upgrade controls, refine control sequences to enhance energy efficiency, and recommend equipment replacement for systems that cannot meet future pandemic operation mode requirements.

Additionally, Farnsworth Group evaluated equipment that needed replacement to ensure it meets operational requirements during future pandemic scenarios. By addressing these aspects, the project improved the mental health domiciliary at the West Palm VA Health Care System’s overall functionality, energy efficiency, and operational resilience.

Veterans Affairs Health Clinic and Domiciliary

Farnsworth Group provided commissioning services for the development, design, and construction of a state-of-the-art 150,731 SF Veterans Affairs healthcare facility. This new clinic provides essential space for mental health and residential health services, prioritizing a warm, welcoming, and therapeutic environment. Conveniently located near I-75 and accessible from Hwy 301 on a sprawling 20-acre site, the facility features outdoor elements, including gardens, courtyards, and walking paths, enhancing the overall experience for patients, guests, and employees. Our commissioning professionals reviewed the design and ensured the quality installation of critical building systems, including the building enclosure, HVAC, controls, plumbing, and emergency power systems.

BayCare Health System Wesley Chapel Hospital

In the heart of Wesley Chapel, Farnsworth Group played a key role in commissioning a new hospital and an attached medical office building. The hospital, spanning 236,162 SF, opened its doors in 2023, featuring 86 licensed beds and a 20-room Emergency Department. The adjacent medical building, covering 85,377 SF, seamlessly connects to the hospital on two levels, providing easy access for patients and staff. The campus offers parking for 795 vehicles.

Our commissioning services covered a range of critical systems, including mechanical, electrical (lighting, emergency power, and distribution), building automation, fire alarm, smoke control, security, and building enclosure. We take pride in contributing to the efficient operation and safety of this vital healthcare facility, which serves the needs of the Wesley Chapel community.

US Department of Veterans Affairs Health Care System

The Veterans Affairs Health Care System in West Palm Beach, FL, is a 10-story, 400-bed facility that spans 77 acres. Since 2022, Farnsworth Group has worked on more than 25 IDIQ task orders to provide various upgrades for an estimated $500M modernization effort. Our services have included developing an energy center master plan to create a road map for modernizing the hospital with new post-COVID guidelines, building a 3-D “digital twin” of the building in Revit to assist with asset management and energy monitoring systems, 3-D scanning (survey), wayfinding, life safety, structural analysis and design, MEP design, and architectural upgrades.

The Estates at Acqualina

The Estates at Acqualina introduced an unparalleled luxury residential experience to Sunny Isles Beach. Situated on the pristine sands of Sunny Isles Beach, The Estates at Acqualina comprises two 50-story luxury condo towers.

This type of high-rise construction showcases Farnsworth Group’s understanding of working on vertical construction with limited space for mechanical rooms and the need to maintain adequate service clearances around equipment when little ceiling or floor space is available. Issues identified early on in the project included the incorrect use of three-way valves in the chilled water system.

Services provided by Farnsworth Group included the commissioning of mechanical, electrical, and plumbing systems.

U.S. Army Corps of Engineers Air Force Sustainable Infrastructure Assessment

ASHRAE Level 2 Energy Audits completed across seven bases and more than 12.3 million square feet.

Farnsworth Group was part of an IDIQ team awarded a multi-installation contract to conduct energy infrastructure assessments throughout seven Air Force installations in the South Atlantic and Midwestern regions of the United States. These assessments consisted of facility condition inventory assessments, real property inventory, space utilization analysis, and High Performance Sustainable Building Checklist evaluation. Farnsworth Group’s tasks centered on ASHRAE Level 2 Energy Audits and project-ready energy conservation measures (ECMs).

Teams were organized to conduct field service visits over a duration of 2-3 weeks, with an intricate system of data collection and implementation of real-time data and technology use. The number of buildings Farnsworth Group assessed on each installation ranged from 14 to 205, including operational, administration, recreational, maintenance, storage, healthcare, emergency response, and dormitory buildings.

After a site visit, information collected was analyzed against current utility usage. ECMs and water saving measures (WSMs) were identified and analyzed for cost of implementation, energy savings and paybacks. All of the information was presented in a single report by installation with a prioritization of what was recommended and estimated construction cost descriptions (using RS Means).

This work involved meticulous planning, continuous and rigorous quality control, and flexibility to accommodate and be non-disruptive to ongoing Air Force mission activity. Some challenges our teams overcame included the following:

  • Compressed onsite schedules required close management of multiple assessment teams for visits to hundreds of buildings in the 2- to 3-week timeframe.
  • Fast-paced schedules with many moving pieces required exceptional safety oversight. Our teams operated under detailed safety and hazard mitigation plans, and we ensured adequate personal protective equipment was used by all personnel.
  • Work inside facilities took place during Air Force daytime working hours. We maintained flexibility to accommodate reschedules when Air Force mission requirements prohibited or limited access.
  • One-time access to each installation required that data collection had to be complete and accurate before we left the installation. A daily automated quality check of collected data was instituted to allow for next day revisits to buildings, if required.

Farnsworth Group identified numerous ECMs that would result in substantial savings, with an average simple payback on investment of four years for the total program.