Tarrant County College District Northwest Campus Redevelopment

Farnsworth Group is providing comprehensive full-building commissioning services from the design phase through warranty for the Tarrant County College Northwest Campus Redevelopment program. This phased initiative encompasses two design packages featuring the construction of four new campus buildings (Buildings 1, 2, 3, and 4) totaling 401,346 SF. Additionally, it includes MEP and envelope renovations spanning 79,297 SF across three existing campus buildings (WBSA, WHPE, WACB) and enhancements to the master site plan.

Our commissioning services encompass various critical systems, such as HVAC, building automation, plumbing, electrical, and fire alarm and suppression. Notably, Building 1 also incorporates laboratory air valves. Envelope commissioning extends to roofing, exterior walls, curtain walls, storefront windows, air and moisture barriers, and below-grade waterproofing systems.

Through interdisciplinary design reviews, Farnsworth Group identified and resolved more than 800 issues, improving document coordination and supporting precise laboratory pressure control requirements..

Capital Renewal Plan

Farnsworth Group developed a Capital Renewal Plan for four facilities in downtown Dallas, totaling more than 1M SF. This plan provided the client with the necessary information to promote fact-based budgeting and future planning for capital improvements.

Farnsworth Group provided a multi-disciplinary team to assess over 1,200 systems assets, building systems, and infrastructure. The data was compiled and analyzed using software that can be easily maintained as future facility improvements are made.

In addition, Farnsworth Group provided expertise in operations and maintenance, energy management, space planning and utilization, and overall program management. Upon completing the Capital Renewal Plan, the client retained Farnsworth Group to provide professional services for executing elements of capital improvements identified in the plan.

San Antonio Zoo Gorilla Exhibit Commissioning

Farnsworth Group is providing LEED-enhanced commissioning services for MEP and building envelope systems at San Antonio Zoo’s newest exhibit.

Congo Falls will be a two-acre habitat, allowing the zoo to house gorillas for the first time in more than 30 years. The new exhibit gives visitors multiple vantage points to view the gorillas including from a future event center built above the habitat on top of the cliff wall. The gorillas will have space to roam and a view of the event center and the San Antonio skyline with a 60-foot gorilla tower called Mays Family Silverback Peak. The feature is the first of its kind in the world.

Tarrant County College Southeast Cooling Tower Replacement

Under a five-year master services agreement, Farnsworth Group performed commissioning for an upgrade project that involved the installation of three new cooling towers, three new condenser water pumps, a state-of-the-art disk filtration system, upgraded building automation system controls for the new mechanical equipment, and new panelboards.

During the design review phase, a single review uncovered 11 issues, all of which were promptly identified, addressed, and successfully resolved. These issues primarily revolved around optimizing the controllability of HVAC systems by adjusting the building automation system.

As the project progressed from design to construction and acceptance phases, nine additional issues were identified and effectively communicated to the design and construction teams.

Tarrant County College District Trinity River Renovations for Staff Relocations

Within the framework of a 5-year master services agreement, Farnsworth Group undertook commissioning services for substantial MEP renovations encompassing the 1st Floor of the West Fork building and the 2nd through 5th Floors of the Clear Fork building at Tarrant County College District’s Trinity River Campus. These buildings, the West Fork standing at six stories with 30,919 SF and the Clear Fork at six levels with 30,402 SF, underwent transformative improvements.

The scope of commissioned systems included:

  • Installation of new HVAC systems, comprising SoHo electric fan-powered terminal units, underfloor terminal units, underfloor ducted terminal units, and the integration of advanced building automation systems to enhance the functionality of these new systems.
  • Retrofitting of existing air handling units (AHUs) for improved performance.
  • Implementation of a new domestic hot water system featuring water heaters and recirculation pumps to ensure efficient hot water distribution.
  • Introduction of new interior lighting and lighting controls to enhance energy efficiency and user comfort.

Throughout the project, two comprehensive design reviews, coupled with diligent construction site observations, identified and resolved several critical issues. One noteworthy example involved the prompt correction of bypass dampers that were inadvertently open, resulting in undesirable heat gain between three existing AHUs and remote floor temperature sensors. These proactive measures underscore our commitment to delivering exceptional results on every front.

Collin College Commissioning Services

Collin College is building a new Technical Campus on a 32-acre site. Farnsworth Group is providing commissioning services for the three-story facility.

The campus will consist of four connected “trade bar” buildings, each dedicated to a different major career concentration area: health sciences, automotive, construction trades, and HVAC / IT / welding. The health sciences trade bar also will house administrative and student services offices. The east side of the site will contain a 600-car parking garage under three of the buildings.

Through the submittal review process, numerous issues and recommendations regarding the building’s MEP systems were brought to the team’s attention. The majority of these issues and recommendations have been resolved and implemented by the construction team which will result in more energy efficient and maintainable systems.

The Farnsworth Group commissioning team has proved to be a valuable and instrumental addition to Collin College’s Technical Campus project team.…The Farnsworth Group’s effective communication and utilization of CxAlloy has allowed the contractor to stay ahead of issues and have items addressed in a timely manner. Nick FiehlerTechnical Campus – Campus Manager, Collin College

University of North Texas Dallas Municipal Building Renovation

Farnsworth Group provided fundamental commissioning and testing, adjusting, and balance (TAB) services for the interior renovation of approximately 107,000 GSF of the Dallas Municipal Building.

The building provides permanent accommodations for the University of North Texas Dallas’ College of Law. The renovation includes integration of historically significant elements into the project. Commissioned systems for this project included mechanical, electrical, plumbing, fire protection, building automation and TAB. Commissioning tasks included design reviews, creating pre-functional checklists, defining readiness criteria for testing, and creating and witnessing functional performance testing on site.

This facility accommodates an enrollment of 500 students. Renovations provide state-of-the-art flexible classrooms, seminar rooms, instructional laboratory spaces, an expanded law library, on-site clinic resource center, faculty and administration offices, and other support areas for students, faculty, and staff. Farnsworth Group became an integral part of the design and construction team to carefully coordinate the MEP decisions that impact the shell and/or the historical nature of the project.

Dallas Independent School District W.T. White High School Storm Shelter Peer Review

FARNSWORTH GROUP PERFORMED AN ICC 500 PEER REVIEW FOR THE W.T. WHITE HIGH SCHOOL. THIS PROJECT PROPOSED THE CONSTRUCTION OF A LARGE CLASSROOM ADDITION TO ALSO SERVE AS AN ICC 500 RATED TORNADO SHELTER.

The wing addition has approximately 12,500 SF of usable space with a maximum occupancy of 2,500.

Farnsworth Group performed a series of reviews for the shelter design starting with drawings and specifications at the 50%, 90% and final sealed drawings for construction. Notes found during our review are provided below:

  • Structural – Calculations were not part of the design package and were later included. We also worked to identify and understand the roof framing and drilled shaft calculations for design verification through multiple reviews.
  • Architectural – Our review team also discovered deficiencies in the design drawings. In a number of places, the storm shelter signage was not adequately shown.
  • MEP – One item identified by our MEP team was the window storm shutters. Our review discovered that these motors were not circuited to the uninterrupted power supply (UPS) and would not have operated as intended during an emergency power outage.

Mesquite Independent School District ICC 500 Storm Shelter Peer Reviews

FARNSWORTH GROUP PERFORMED AN ICC 500 PEER REVIEW FOR THE TORNADO SHELTER PROPOSED AT THIS EXISTING CAMPUS.

The project proposed construction of a new gymnasium addition that will also serve as an ICC 500 rated storm shelter. The total usable area as a tornado shelter was designed at 7,062 SF with a maximum occupancy of 1,344. The design of this tornado shelter utilized natural ventilation with louvers and emergency lighting on battery backup.

Farnsworth Group’s team discovered a few deficiencies in the design.

  • At two doorways, the appropriate signage was not shown in the design drawings and needed to be corrected.
  • During the review, or team noted that a fire rated barrier was not designed where required.

Farnsworth Group also provided value engineering solutions by pointing out unnecessary design features. In this case the fire barrier was not required along the external face of the building where fire hazards from adjacent combustion were not present.

Dallas Independent School District Multiple Storm Shelter Reviews

UNDER A CONTRACT FARNSWORTH GROUP HOLDS WITH DALLAS INDEPENDENT SCHOOL DISTRICT (DISD), WE HAVE COMPLETED ICC 500 INDEPENDENT THIRD-PARTY PEER REVIEWS FOR 14 STORM SHELTERS.

Farnsworth Group served as ICC 500 independent third-party peer reviewers for 14 DISD school projects. These projects vary in design scope from new construction and additions to existing campuses. Our review teams of design experts are comprised of certified professional engineers and architects.

As part of our service, we specifically reviewed:

  • Strength and allowable stress design for structural members and appurtenances
  • Rain, wind and live loads
  • Wind-borne debris impact resistance and protection
  • Calculations showing all relevant gravity systems, lateral systems, connections and foundation design calculations, which show complete load path
  • Associated loads and reaction to any delegated design proposed by the designer of record

We also verified:

  • Occupant density
  • Usable storm shelter floor area
  • Number of doors, including direction(s) of swing
  • Emergency escape opening, including location and operation
  • Door operation, including latching mechanisms
  • Accessible route(s) to the shelter space
  • Signage requirements
  • Specifications regarding quality assurance and/or special inspections
  • Adequate provisions for fire safety, including barriers, fire extinguishers and first aid inclusion

Critical support systems, including ventilation, sanitation and emergency lighting are also verified for compliance.

Our projects for DISD included 10 high schools, three elementary schools and one middle school. Our team continues to provide a variety of services under an on-call contract.