West Des Moines Fire Station and Training Tower

The City of West Des Moines needed a dedicated fire training facility, future fire station site, and water rescue training area to support a growing community and expanding public safety operations.

Farnsworth Group led a planning study for an 11.5-acre site, developing three conceptual layouts that integrated a multi-story fire training tower, emergency vehicle driver training pad, water rescue training pond access, equipment storage area, and a future 18,850 SF fire station. The plan also coordinated connectivity with an adjacent National Guard Readiness Center to expand training opportunities.

The master plan provides a clear roadmap for future growth while giving the Fire Department its first dedicated training facility, enhancing emergency response readiness, firefighter training capabilities, and long-term operational efficiency.

A survey of the pond on the site determined it has a maximum depth of 8 feet, which will be sufficient for the needs of water rescue training.

During this planning study, construction began on an adjacent National Guard Readiness Center, also designed by Farnsworth Group. The plan required easy access from the training tower and fire station to the Guard facility, where spaces will be made available for the department to utilize for education and training.

Project highlights included:

  • Three conceptual site development options evaluated
  • 11.5-acre training and public safety campus planned
  • 4,260 SF multi-story fire training tower programmed
  • 69,600 SF emergency vehicle driver training pad included
  • Future 18,850 SF fire station planned with four drive-through bays
  • Existing pond confirmed suitable for water rescue training
  • Direct coordination with adjacent National Guard Readiness Center for shared training resources

Dallas County Administration Building

The administration staff of Dallas County required a new facility that would accommodate future growth, provide the latest technology, and better serve the residents and businesses of the County.

The 54,000 SF building will house nine county departments in one location providing residents access to the treasurer, recorder, assessor, veterans affairs, GIS, planning and zoning, and the board of supervisors.

The building will also house information technology, operations and finance, and human resources along with a new board room, a large training room, and multiple smaller meeting rooms.

Located on the Adel city square, the main entrance and courtyard is centered with the main entrance of the historic courthouse creating a direct relationship between the two buildings. The design team worked with the City of Adel and the County supervisors to design a building that was respectful of the surrounding Historic District and used local materials such as Adel brick.

Future growth of the county was a key design factor. The building was designed to meet current and anticipated needs in a sustainable way. The building is expected to be 50% more efficient than the county’s current facilities.

City of Altoona City Hall and Police Station

Farnsworth Group (formerly Design Alliance) provided architectural design services for a new City Hall and Police Station facility containing all city hall offices, training rooms, break room, council chambers, and support areas. The facility is home to the Altoona Police Department range, and contains interrogation rooms, booking, sallyport, roll-call room, training, locker rooms, state of the art firing range, and support spaces. The project was constructed with Ryan Companies US, Inc. as the developer/contractor.

Iowa National Guard Readiness Center

Farnsworth Group led a team of local consultants to provide A-E design services for a new Army National Guard Readiness Center co-located on a 48-acre site with a future Fire Station and Training Center serving the City of West Des Moines. The schematic design effort (10% submittal) included a site plan showing desired site ingress and egress, as well as proposed location for the municipal fire station.

The Readiness Center has been designed to include an assembly hall, caged storage, unit supply and vault storage, kitchen, classroom, individual equipment storage, latrine / shower / locker room spaces, physical fitness area, and unit administration areas to support the Infantry and the Transportation Company occupying the building. Supporting elements include a controlled waste handling facility, a flammable materials handling facility, a back-up generator, and an electricity producing photovoltaic system. Site features include paved parking for military and privately owned vehicles, access roads and sidewalks, a wash platform, a loading ramp, stormwater management facilities, and all required site utilities.

All construction meets applicable State of Iowa adopted building and safety codes, as well as applicable Unified Facility Criteria. The project is targeting LEED v4 Silver certification.

Iowa State University Enrollment Center Renovation

The roof covering of the Enrollment Services Center consisted of 115-year-old clay tile, copper, and EPDM materials. Many of these had reached the end of their useful service life, so Farnsworth Group was retained to comprehensively upgrade the entire roofing assembly. In addition, there were areas of exterior masonry wall in need of tuck-pointing, as well as repair or replacement of the skylight system, and elimination of rodent entry points. Services for this project included the analysis and development of recommendations and contract documents for the repair/replacement of the roofs, underlayments, sheathing, masonry deterioration, skylights, rodent entry, building soffits, and accessory items. The Enrollment Services Center houses the Office of Admissions and the Office of the Registrar and is listed on the National Register of Historic Places.

City of Johnston Public Safety Building

Our team had extensive involvement in community engagement to help ensure the success of this Public Safety Building.

This 45,000 SF Public Safety Building contains headquarters for the Police and Fire departments. A satellite safety facility was also constructed to serve the west side of the community. Complete fire facilities were provided. Police space includes extensive operations, detective, detention, questioning, and evidence receiving, processing, storage, and return capability. Space is provided for vehicles, as well as hazardous and biological items. The projects is certified LEED Silver.

The team prepared multiple materials in advance of the bond issue. A referendum was passed with an 82% yes vote.

Dallas County Law Enforcement Center

The Dallas County Law Enforcement Center is the result of a 4-year collaboration of the Dallas County Sheriff’s Department, Police, the Design Team, and the construction manager to deliver a highly energy-efficient and advanced law enforcement facility that will serve the county for years to come.

The facility contains the full compliment of the Dallas County sheriff’s department which includes administration, jail support, and jail incarceration.

The design achieves the transition of public access for the administration duties to the high level of security for the arrestees. This is accomplished with a simple functional block transition from the public access to the security areas deeper in the building. The administration block is positioned along the front of the building parallel to the public right-of-way. Jail support is the next block, positioned with major circulation for access by the department staff from either the administration or jail cell block functions. And the final block is the high-security jail cell pod.

The facility is designed with expansion in mind. Dallas County is acknowledged as one of the fastest-growing counties in the nation. Expansion is critical to the ability of the county to support the tremendous growth. The support functions of the facility have been designed to accommodate a total population of 520.The first cell pod will house 130 inmates, with each additional pod housing the same number, depending on housing type, i.e., dormitory or individual cells.

Iowa City Community School District South East Junior High Expansion

Farnsworth Group’s architecture team designed this renovation and expansion that allowed South East Junior High to respond to a growing student population.

The original building was constructed in 1958 with several previous additions added through 2009. Our design team’s assessment of the facility resulted in two separate additions. One addition provided two new science classrooms that were designed as part of their collaborative learning suites and an educational program the school was looking to expand. The second addition was also two-stories and located in the existing courtyard, recapturing space that was no longer used. The courtyard addition contains three classrooms on the first floor and a new media center and outdoor learning patio above.

The renovation also included a new geothermal HVAC system, sprinkler system, LED lighting and renovated restrooms. A general update of finishes including new flooring, ceilings and casework was provided throughout. The administration areas were consolidated and redesigned to meet their current and future needs.

SE Junior High Science Lab

Iowa City Community School District Lincoln Elementary School Addition

Farnsworth Group was hired to design the addition of a gymnasium, playground entrance and music room.

After considering several “routine” expansion options that could be used for bus drop-off, parking and a new playground, Lincoln Elementary School decided to construct a new 16,000 SF two-story addition by taking advantage of unused areas behind its existing building. Originally built in 1926, the building had additions in 1949, 1954, 1973, 1974 and 1988. The existing building sits at the upper level of a steeply sloping 3.5-acre site that dives into a ravine.

The project remodeled and updated all the classrooms and other spaces in the school and provided a new VRF HVAC system and fire protection system. Many existing small restrooms were removed and replaced with a large new central restroom.

The project involved several unique construction techniques including the use of geofoam to infill the existing gymnasium to provide accessibility, and the use of a soil nail wall to accomplish the grade change when putting the gymnasium at the lower level behind the existing school.