Bright Stalk Wind Farm

Farnsworth Group provided transportation engineering design, surveying construction support, permitting, and architectural/building design services for the 300 MW Bright Stalk Wind Project consisting of 167 turbines.

Design services included evaluating 9 miles of county highways and 29 miles of township roadways.  Roadways to be strengthened and widened were determined as well as the number of miles of private roadways to be constructed.
Transportation services for the Bright Stalk Wind Project included:

  • Aerial data processing
  • Base map development 
  • Transportation plan development 
  • Geotechnical oversight/review 
  • County highway evaluations, including drainage
  • Township roadway evaluations, including drainage
  • Turbine, private road and UG & OH electric route micrositing 
  • Refining micrositing based on noise study results 
  • State highway, county highway, & township roadway permit applications 
  • County highway and township roadway intersection improvement plans 
  • Township roadway improvement plans – strengthening & widening, including drainage 
  • Private roadway access plans 
  • Laydown yard preliminary site plan 
  • Utility Relocation Coordination
  • Project Meetings / Walkdowns
  • Stormwater Pollution Prevention Plan (SWPPP)
  • Spill Prevention, Control and Countermeasures Plan (SPCC)
  • Preconstruction Roadway Condition Survey