City of Pekin Elevated Water Storage Tank

Client

City of Pekin

Scale

1,250,000-gallon

Location

Pekin, IL

Year

2013

Farnsworth Group provided design, bidding assistance, construction administration, and construction observation for a 1,250,000-gallon elevated water storage tank with a passive mixing system and 16-inch connecting water main.

The new tank was constructed to serve the City of Pekin and surrounding area that had limited storage capabilities in the area. The site was purchased as a place to locate a Water Treatment Plant in the future.

The project includes separate in/ out piping and a passive-style mixing system with features located at grade, rather than within a below-grade vault.

The project is highly visible from both the Illinois River, the adjoining sports complex, and the nearby State Route welcoming residents into the City.