Farnsworth Group, along with several subconsultants, studied and prepared conceptual plans for the future development of the Boneyard Creek North Branch Improvements and Oak Ash Detention Basin expansion. The primary objective of the study is to provide protection to the City of Champaign from the 1% annual chance storm event (100 year) along the Boneyard Creek from University Avenue upstream to the diversion structure at Neil Street. Secondary goals of the project include creating a healthy stream environment, developing a community amenity in the creek and surrounding floodplain area, supporting economic development, and maintaining and improving traffic circulation. Alleviating flooding, preventing bank erosion, and enhancing stormwater conveyance are also key objectives in the project.
Farnsworth Group will be presenting the City of Champaign this Fall 2016 with conceptual design plans of several alternatives and options at key locations along the Creek, including at the railroad crossing, the Oak Ash Detention Basin, and the Bristol Place detention basin. Once the City reviews the conceptual plans, Farnsworth Group will begin working on the Preliminary Design Phase and more detailed cost estimates of the Boneyard Creek North Branch Improvements with the subconsultants. All channel design, permitting, detention calculations, and best management practices design are being provided by Farnsworth Group.
The Village of University Park, IL, needed a reliable long-term water supply solution to support existing residents, future growth in southeastern Will County, and the planned South Suburban Airport while addressing regional water capacity and infrastructure needs.
Farnsworth Group completed a comprehensive water supply study evaluating multiple alternatives, including groundwater development, Lake Michigan water service, and a transmission main connection to the Aqua Illinois system in Manteno. Following selection of the preferred alternative, Farnsworth Group led easement acquisition and right-of-way negotiations, secured the project corridor, and provided full design services for a 24-inch water transmission main.
The project established a dependable, scalable regional water supply system capable of supporting long-term community development while minimizing risk during implementation. By guiding the project from planning and route selection through final design, Farnsworth Group streamlined delivery and helped position the region for future economic growth.
The Farnsworth team successfully negotiated easements with private property owners and public agencies, established the final 14-mile transmission main route, and completed design services for a multi-segment project that was fully operational.