The Libman Company commissioned Farnsworth Group to design a new 20,000 SF office building. The new office building will consolidate all of the administrative staff into one area instead of being spread throughout the factory. Three schemes were provided with a variety of different amenities. Core elements of the building include: 25 private offices, 35 open offices, reception area, planogram room, and grab-n-go café. The new office building will be built on the north end of their current campus, and will be attached to the existing factory. Paramount to each design is incorporating the Libman branding scheme into the concepts.
Farnsworth Group provided engineering and surveying services for a 1.75 Bcfd natural gas interconnect that tied three Gulf Coast pipelines to Tallgrass Energy’s Rockies Express Pipeline. The design required pressure control facilities and a lateral to connect the REX meter facilities to the Gulf Coast Pipelines. The design of the lateral line included approximately 2000’ of trenched pipe installation, the crossing of US-36 via conventional bore methods, the crossing of a large drainage ditch which was installed via open trench methods and tying into the three existing Gulf Coast pipelines downstream of NGPL’s Hammond Compressor Station. The pressure control facilities were installed in an existing compressor station, and encompassed the mechanical, structural, electrical, and instrumentation design to conform to industry and client standards.
Farnsworth Group’s services included route evaluation, survey, design and drafting, tie-in details, easement, exhibit preparation, contract documents, permitting assistance, and as-built drawings.
Farnsworth Group provided comprehensive design services to completely renovate an existing office and warehouse building originally designed and constructed by Farnsworth Group in the mid-1980’s for the Illinois State Lottery. The renovations included new administrative offices for the Southern Illinois University School of Medicine. A mezzanine was constructed in the previous warehouse, providing an additional 20,000 SF, which resulted in over 80,000 SF for offices, workstations, a data center, break rooms, restrooms, conference rooms, and support spaces. New mechanical and electrical systems were created as part of the renovation as well. In addition to the interior renovations, new entrance canopies were installed, and the parking lot was expanded.