United States Air Force Academy Foundation and Association of Graduates Wecker Hall

The Association of Graduates contracted RTA Architects and Farnsworth Group to provide a zero energy roadmap for the US Air Force Academy Foundation Building on the Air Force Academy in Colorado Springs, CO.

The roadmap delineated an all electric building that could be built to a zero-energy standard. Once the roadmap was completed, it was delivered to the design team to create a full design package for the building.

While RTA Architects created a striking building, our team designed an efficient lighting system, a geoexchange heat pump HVAC system, a vertical geoexchange borefield, and a plumbing system that incorporated high-efficiency fixtures and a heat pump water heater. HVAC zoning and controllability were critical, as were building lighting and aesthetics inside and out, which required a high level of coordination. During design, the team worked with the energy modeling team to further refine the MEP systems and energy model, resulting in a very efficient building supported by the photovoltaic array on the roof, which our team helped size.

The estimated dollar savings will be approximately $44,640 per year for the life of the building, and should result in a zero-energy building on an annual basis. This project is the first zero-energy building on the USAFA campus and has drawn significant interest from the Air Force as it demonstrates what is possible on a military facility.

Colorado Springs Senior Center

The City of Colorado Springs needed to replace its aging senior center with a modern, accessible facility that could better support wellness, recreation, healthcare, and social engagement for a growing senior population.

Farnsworth Group provided mechanical, electrical, and plumbing engineering services for the new 23,000 SF Colorado Springs Senior Center. The facility was designed as a vibrant community hub featuring a library, lounge and dining areas, fitness and multipurpose spaces, clinic exam rooms, indoor and outdoor pickleball courts, and dedicated areas for cooking, technology, and wellness programs. The team also coordinated demolition of the existing buildings and utility service connections for the replacement facility.

The new center delivers a welcoming, energy-efficient environment that promotes health, lifelong learning, and community connection while supporting the City’s sustainability goals through electrified building systems and modern infrastructure.

Project highlights include:

  • 23,000 SF replacement senior center funded through the American Rescue Plan Act
  • Features fitness, healthcare, recreation, dining, and educational spaces under one roof
  • Heat pump rooftop units and domestic water heating systems support facility decarbonization goals
  • Coordinated demolition, utility service extensions, and new building infrastructure
  • Feature lighting enhances gathering spaces, entry areas, and multipurpose roomsIncludes indoor and outdoor pickleball courts, outdoor activity areas, and flexible community spaces for senior programming

Southeast Colorado Hospital Addition and Renovation

Farnsworth Group provided mechanical, electrical, and plumbing engineering services for an 8,690 SF hospital addition and 17,680 SF renovation at Southeast Colorado Hospital, a Critical Access Hospital.

The project added a new physical therapy and rehabilitation wing along with a redesigned emergency department entrance and waiting area. Renovations reconfigured administrative, dietary, laboratory, imaging, observation, and emergency department spaces to improve operational efficiency and patient care.

MEP improvements included HVAC modifications for renovated areas, a new rooftop air handling unit serving the addition and patient wing, expanded medical and utility gas systems, updated plumbing infrastructure, and enhancements to normal and emergency power distribution, lighting controls, low-voltage systems, and medical equipment connections.

Key improvements included:

  • 8,690 SF additional and 17,680 SF renovation
  • New physical therapy and rehabilitation wing
  • New emergency department entrance and waiting area
  • HVAC, plumbing, medical gas, and electrical system upgrades
  • Enhanced support for patient care, staff operations, and facility reliability

Pikes Peak Hospice and Palliative Care

The Pikes Peak Hospice & Palliative Care project involved converting 19,300 SF of office space into a fully functioning inpatient hospice facility.

The new space includes 12 private inpatient rooms, two of which are isolation/negative pressure rooms designed to meet a range of patient needs.

Family and support areas feature a commercial kitchen, a serene chapel for quiet reflection, a medication room, and dedicated staff workspaces. A small building expansion was added to create a family gathering area with views of a new garden and walking path framed by the mountains.

The conversion also included major infrastructure upgrades: a new emergency generator and distribution system, bulk oxygen assembly, medical vacuum system, and comprehensive updates to HVAC, fire alarm, fire protection, and plumbing systems.

Penrose Hospital Pharmacy Replacement

With the pressing need to revamp its outdated facilities, Penrose Hospital embarked on a journey to revolutionize its pharmacy services. Collaborating closely with key stakeholders, Farnsworth Group engaged in comprehensive consultations, aligning our vision with the stakeholders’ unique needs and aspirations; our mission was to design a 5,000 SF exceptional pharmacy that met USP 797/800 standards and set new benchmarks for the hospital.

Teaming up with RTA Architects, the Farnsworth Group Mechanical, Electrical, and Plumbing experts crafted bespoke solutions tailored to the hospital’s evolving demands. Our focus remained on delivering seamless operations and unparalleled efficiency, ensuring a pharmacy that thrives at the forefront of modern healthcare.

Beyond aesthetics, our design emphasized safety, compliance, and patient care, forging a new era of healthcare excellence for Penrose Hospital. Our work resulted in a revolutionary pharmacy, empowering Penrose Hospital to better serve its community through precise care. Together, we’ve laid the foundation for a brighter and healthier future.

Western Colorado University Paul M. Rady Computer Science Building

Western Colorado University posed a unique challenge: provide a high-end design for a School of Computer Science and Engineering building on an accelerated time schedule without a fully defined program of needs.

Our team met the challenge by creating a conceptual design that gains its inspiration from the technology it embodies. The form and function of the design is rooted in the technology that defines its curriculum, expressed by materials and details taken from the surrounding campus. We began with a modular classroom cluster that repeated on an east-west axis that offered open gathering spaces abutting the technical labs and administrative support areas. The resulting design is a creative interpretation of the existing architecture that articulates the environment of Western Colorado University.

This modern building was designed with a nod toward incorporating the technology of the future to train students in an environment of ingenuity, visualization and creativity. The central gallery that anchored the project offered students expansive views and created the opportunity for solar harvesting while maximizing natural light throughout the common areas.

Design Features

  • The building offers a gateway to the Western campus while complementing the surrounding environment.
  • The central gallery is flanked by a dynamic canted glass curtain wall protected by a large southern overhang that shields the hot summer sun while allowing the winter sun to penetrate the glass and add warmth to the interior space.
  • Entry into the building allows for scenic views across two levels and highlights the campus’s signature W feature on the nearby mountain peaks.
  • Classrooms, lecture halls, and collaboration spaces communicate with all levels as they experience the central gallery and its views.

Western Colorado University Mountaineer Bowl Events Complex

The Mountaineer Bowl Events Complex at Western Colorado University sits at 7,771 feet elevation, making it the highest college football stadium on earth. However due to the facility’s age, it no longer inspired the alumni, athletes or students.

Thanks to a generous donation by Paul and Katy Rady, Western Colorado University chose Farnsworth Group for a $15M renovation to transform the Mountaineer Bowl Complex into a championship-caliber facility:

  • A new 10,000 square-foot press box with locker and training rooms; a scorekeeper’s box; coaches’ boxes; broadcast booths; hospitality suites; filming platform; restrooms, and a concession area with a concourse
  • A new 20,000 square-foot gateway entrance to the Mountaineer Bowl Events Complex, with a new ticket office, two locker and training room facilities, officials’ locker room, and restrooms
  • The addition of an artificial turf playing surface and lighting that will allow for expanded use
  • A new video/scoreboard with a filming platform
  • A resurfaced track

The transformational renovation is now the new home for Western Colorado University athletic events in a championship-level facility. The new complex will help support athlete recruiting, alumni support, and expand press capabilities to feature Mountaineer sports at a national level.

Pueblo Community Health Center East Side Clinic Net Zero Energy Road Map

Farnsworth Group analyzed energy goals to create a road map toward net zero energy for the new three-story Pueblo Community Health Center East Side Clinic. Our team then designed the mechanical, plumbing and electrical systems to achieve those goals, returning approximately $126,000 in savings from Black Hills Energy rebates.

Our commissioning team supported initial goal setting, identifying practical, sustainable options and approaches, and prepared the documents to serve as a road map to achieve the owner’s energy goals. The effort included setting goals set in a study, then tracking them to completion. The study also documented the historical utility usage of the owner’s previous facility to develop an operational baseline.

The East Side Clinic is the first Zero Energy outpatient clinic in the state of Colorado, according to the New Buildings Institute.

Sustainable Design

The sustainable features for the East Side Clinic include:

  • A geothermal heating and cooling system incorporating a dedicated outside air energy recovery unit
  • 280 kW photovoltaic array on a covered parking structure and the building’s roof
  • LED lighting

City of Boulder Parks and Recreation Department Visitor Services Center

FULL-SERVICE DESIGN SERVICES WERE PROVIDED THROUGH A PHASED PROJECT APPROACH.

The Visitor Services Center facility and surrounding amenities at the Boulder Reservoir are designed to provide the user with an improved experience. The approach to the building guides the user through the glass vestibule while giving a glimpse of the Reservoir in the distance. The building siting and layout is organized to allow different levels of engagement with the facilities depending on the user.

Users can pass through the vestibule and head straight for the reservoir down the steps or go into either side of the vestibule to the locker room facility or the admin / dining area. Large roof overhangs provide weather protection during a storm and shade during the hot summer months. The dining area contains a concessions counter and large windows and operable doors opening to the plaza.

Design features include:

  • Open plaza with dining areas with views of reservoir activity.
  • Prominent indoor / outdoor fireplace offers ambiance while allowing for comfortable seating area for visitors.
  • Well-placed trees, seat walls and boulders provide shade and natural seating options.
  • The locker room facility provides day users with restrooms, showers and changing areas.

Accessibility is also addressed with the approach and immediately adjacent site being on one level with minimal grade changes allowing everything to be easily accessed. ADA accessible ramps allow for access down to the beach level providing similar experience and opportunities for all users of the reservoir.

Boulder Reservoir Visitors Center - Interior

Sustainability and energy conservation measures are reflected in multiple elements including the wall construction, material selections, incorporation of daylighting, roof design with solar panels and solar harvesting, roofing recycled material content, and high-efficiency HVAC, and building orientation. Sustainability was also considered in the landscape materials that include permeable pavers and native grasses and plantings.

Orchard Town Center

Our client challenged our design team to reposition the Orchard Town Center development to achieve its maximum potential.

The 65-acre, mixed-use regional center needed an infusion of new concepts, strong tenants and opportunities for more vibrant uses. Constrained by a legacy of entitlements, design guidelines and leases, the regeneration process is a complex puzzle of moving parts. Farnsworth Group took on the architectural responsibilities to design several new anchors and tenant spaces as well as scores of projects that allow for changes of use and upgrades in the neighborhood shopping district.

Landlord improvements have included extensive relocation of tenants, upgraded and consolidated services, new storefront character additions and redesign of public spaces. New build-to-suit retailers have ranged from 4,500 SF upwards to 30,000 SF.