Whitney Hill Wind Farm
Farnsworth Group is providing surveying, transportation engineering, site design, and permitting services for the 43 MW Whitney Hill Wind Project consisting of 26 turbines and 4 miles of external transmission lines.
Design services will include 12 miles of County and Township Roadway improvements.
Transportation and site services for the Whitney Hill Wind Project includes:
- Base map development
 - Assisted with road use agreement development
 - Transportation plan development
 - County and township highway evaluations (including drainage)
 - Pre-construction public roadway condition survey
 - Traffic Impact Analysis (TIA) report
 - State highway, county highway, and township roadway permit applications
 - Railroad permit applications
 - Coordination with railroad related to crossing improvements
 - Coordination with IL Department of Natural Resources and the Army Corps of Engineers
 - Utility relocation coordination
 - Coordination meetings with road authorities
 - County highway and township roadway intersection improvement plans
 - Township roadway improvement plans - strengthening and widening including drainage
 - Private access road design including drainage
 - Turbine site designs
 - Lay down yard design and grading plans
 - 2D hydraulic site analysis
 - Crane routing plans
 - Site, private and public roadway bill of quantities
 - Site, private and public roadway technical specifications
 - Spill prevention, control and countermeasures plan (SPCC)
 - Construction administration and support