Skip to main content
Alta Farms II Wind Project

Alta Farms II Wind Project

Farnsworth Group is providing transportation engineering, site design, and permitting services for the 200 MW Alta Farms II Wind Project consisting of 66 turbines. 

Design services will include 39 miles of County and Township Roadway improvements.  

Farms II Wind Project includes:

  • Base map development
  • Assistance with road use agreement development
  • Transportation plan development
  • County and township highway evaluations (including drainage)
  • Pre-construction public roadway condition survey 
  • Traffic Impact Analysis (TIA) report
  • State highway, county highway, and township roadway permit applications
  • Railroad permit applications
  • Coordination with railroad related to crossing improvements
  • Coordination with IL Department of Natural Resources and the Army Corps of Engineers 
  • Utility relocation coordination
  • Coordination meetings with road authorities
  • County highway and township roadway intersection improvement plans
  • Township roadway improvement plans - strengthening and widening including drainage
  • Private access road design including drainage
  • Turbine site designs
  • Lay down yard design and grading plans
  • 2D hydraulic site analysis 
  • Crane routing plans
  • Site, private and public roadway bill of quantities
  • Site, private and public roadway technical specifications
  • Spill prevention, control and countermeasures plan (SPCC)
  • Limited construction administration and support